Sepulveda Transit Corridor Project

Virtual Open House recordings are now available!

 

Video recordings of the Virtual Open House have been posted in English and Spanish on Metro’s YouTube channel. The Open House began with a project overview, then broke into two separate webinars for focused station information. One webinar focused on Valley stations (Van Nuys Metrolink to Ventura Bl), and the other on the Westside stations (Getty Center to E/Expo Line). Videos for all three webinars and the general Q&A session are listed below. 

 

We recommend watching the videos in the following order:

·     Project Overview Webinar

·     Valley Station Webinar and/or Westside Station Webinar

·     General Q&A

 

We still want to hear where you think the stations should be. Whether or not you attended the virtual or in-person events, please review information aboutstation location considerations, spend some time with the Station Location StoryMap so you can understand the proposed station and entrance locations, and share your thoughts with us. The online feedback form can be accessed here.

 

Materials that were shared at the open houses can be found below:  

Field Work for the Sepulveda Transit Corridor

 

As part of the environmental review process for the Sepulveda Transit Corridor Project, Metro’s technical contractors and consultants are performing field work to evaluate and gather information on existing geological conditions throughout the project study area. This work includes bore drilling, installation of groundwater pressure sensors and water pressure testing.

 

Field work is currently ongoing at the following locations below. Click on the links below to view active field work notices.  

·     Chalon Road (11200-11300 block) 

·     Nicada Dr, south of Mulholland Dr 

·     Ravenwood Court, west of Beverly Glen Bl 

 

If you would like to be notified via email regarding upcoming field work, please sign up here